Being able to obtain horizontal level, vertical level, cross-line & 90° and plumb-dot at ease; simplify the work-process and shorten the time consumed for surveying and measurement works ie. the important pre-requisite work when doing masonry, installation of finishing items (like window/glass/door/aluminum panels/cabinets/tiles/timber flooring/plaster ceiling/partition wall) as well as installing decorative items (like painting, mirror, photo frame etc)
1 Vertical & 1 Horizontal Level; 1 Cross-line
Please contact us for the latest price
No comments:
Post a Comment